When should a business change make you look at the electrical papers?

Use the commercial EICR service for quotations and inspection enquiries. This page is the narrower question: which changes are a reason to read the report you have, and which are not a new legal clock.

Reviewed 6 October 2026 by Michael (Technical Supervisor) and George Opsenica (Director, Codeex Maintenance Ltd). General guidance, not a reading of your own report and not legal advice.

What each reviewer checked
  • Michael: Technical review of the exact current technical sentences on this page. It includes the technical reassessment wording. This is not legal review..
  • George Opsenica: Owner presentation of this current page. Source-based regulatory editorial review of the exact current fresh regulatory sentences. This is not a technical electrical review and it is not legal advice..

There is no automatic deadline on this page

A change in a business does not, by itself, create a statutory EICR deadline.

A workplace duty under the electricity at work regime is not the private-rented five-year interval.

A landlord, tenant, insurer or facilities request for papers or a planned inspection is a business request. It is not, by itself, a statutory EICR deadline.

ReasonWhat it is
The installation, occupation or equipment has changedA reason to read the report and the scope. Not a new statutory deadline.
A customer, insurer or facilities requestA request for papers or a planned inspection. Not, by itself, a legal clock.
A workplace dutySeparate from the private-rented five-year interval. This page does not restate that interval as an office rule.

When the papers are worth opening

A change is a reason to look at the electrical papers you already hold when the installation, the occupation or the equipment has changed.

That includes a new occupier, a fit-out, new circuits or equipment, a change of use, a landlord and tenant handover, or a facilities request for a planned inspection.

  • New occupation

    The incoming occupier may need the report that describes the installation they are taking.

  • Fit-out or new circuits

    New work is certificated as new work. It is not the same document as the condition report.

  • Change of use

    The way the space is used can change what a later inspection needs to include.

  • Handover

    Landlord and tenant papers are a reason to see which report covers which part.

This is not the price page

Prices and the reason a commercial job is quoted manually belong on the commercial service and the commercial quotation guide, not here.

The commercial service

Start with commercial EICR certificates. How a commercial price is quoted is the commercial quotation guide.

Open the papers when the installation changes.

A business change is not, by itself, an EICR deadline.