EICR · NICEIC or NAPIT registered engineersYour EICR price in 30 secondsNo payment now
London EICR Certificates logoLondon EICRCertificates
Call

Completed work is not automatically an EICR

Completed electrical work is not automatically certified by an EICR. An Electrical Installation Condition Report describes an existing installation at the time of the inspection. It is not the certificate for the job that has just been finished, and not every job needs a new one.

Updated 27 October 2026. General guidance, not a reading of your own report and not legal advice.

Match the document to the question

DocumentThe question it answersWhat it does not answer
EICRThe condition of an existing installation on the inspection dateThat new work was certified
Electrical Installation CertificateNew installation work that the certificate coversThe condition of the rest of the installation
Minor Electrical Installation Works CertificateThe minor work that the certificate coversA survey of every circuit

When people ask for another condition report

Ask for an EICR when someone needs the condition of the existing installation: a landlord's inspection duty, a buyer who has chosen to commission one, or a workplace that is planning an inspection. Do not ask for one merely because a socket was added, and do not treat the condition report as the paperwork for that socket.

If the job came with an installation certificate or a minor-works certificate, keep that certificate with the job. A later EICR does not replace it, and it does not rewrite the day the work was done. The detailed difference between an installation certificate and a minor-works certificate is not this page. This page only stops the condition report being used as either of them.

For a specified tenancy in England, arrange inspection and testing by a qualified person at least every five years, or by an earlier date stated in the report. Provide the required report before a new tenant moves in. Government guidance explains when an existing valid report can be used on re-letting; check its findings, next-inspection date and any changes to the installation rather than assuming that every new tenancy needs a new EICR.

If the worry is the job that has just been finished, keep the certificate for that job. If the worry is the rest of the installation, the question is a condition report. A socket added in one room does not, by itself, describe the other circuits. A landlord duty, a buyer who has chosen to commission a report, or a workplace inspection plan can still justify an EICR. The fact that work happened is not that justification.

QuestionStart withDo not start with
Was this job certified?The certificate that came with the jobA new EICR
What is the condition of the rest of the installation?An EICR, if that is the inspection being asked forThe minor-works certificate for one alteration
Does a landlord duty apply?Whether there is a specified tenancyThe fact that someone did some wiring
How do an installation certificate and a minor-works certificate differ in detail?Not this pageA comparison this article is not going to finish

Where the other explanations sit

The wider document names are on the report and certificate page. An inspection of the existing installation starts on the testing page.

Keep the job certificate

An EICR describes the existing installation. It does not certify the work that has just been finished.

CallWhatsAppPrice