Guidance library
EICR Guidance and Blog
Start with the question in front of you, not the publication date. This curated London EICR library groups practical guidance by finding, audience and next step so landlords, homeowners and commercial dutyholders can reach a relevant explanation without searching an unfiltered archive.
What this curated guidance library is for
The hub brings together implemented, reviewed guidance routes that answer recurring questions about EICR findings, inspection planning and report outcomes. Each listing has a page-specific summary so you can judge whether it addresses your issue before opening it. The library is selective rather than chronological: an older durable explanation can be more useful than a newer article whose subject does not match your report. Further implemented guidance on the same topics is listed in those groups rather than left unlinked.
Only topic groups containing published entries are shown. We do not create empty taxonomies, thin tag archives or new category routes simply to make the library look larger. Individual articles remain responsible for their detailed subject, qualifications and sources; the hub helps you choose between them. If wording on your report differs from an article scenario, use the report wording and seek project-specific advice rather than assuming the article assigns a code.
Codes and findings: interpret the observation first
The findings group starts with the durable C1, C2, C3 and FI classification guide, then offers focused articles about C2 wording, RCDs, surge protection, AFDDs, high Ze, protective bonding and a bathroom shaver-socket scenario. These pages explain concepts and useful questions. They do not assign a universal classification from one missing device or one test value because outcomes depend on the installation, observed risk and report context.
Use the report-example guide if you need help locating the outcome, observations, limitations and schedules. It uses a privacy-protected inspection record to explain the sections; it cannot authenticate another report. Where a finding may present immediate or potential danger, follow the report and competent electrical advice rather than waiting for a blog article to settle a site-specific technical decision.
Landlord and homeowner guidance answer different questions
Landlord guidance covers issues such as an unsatisfactory outcome, documented attempts to obtain tenant access and the context for short-term lets. Legal duties vary with jurisdiction, tenure, property and facts, so these articles use qualified language and direct readers towards current official guidance where appropriate. They provide general information, not legal advice, and do not replace the landlord’s compliance records or advice about a particular tenancy.
Homeowner guidance focuses on condition evidence, renewal planning and who may carry out an EICR without importing private-rental rules into every owner-occupied home. The validity guide is the starting point when somebody asks whether an existing report is still useful. It separates legal requirements, the report’s recommendation and requests from buyers, lenders, insurers or managing agents instead of claiming one universal life for every certificate.
Process, preparation and report outcomes
Process articles help before and after the site visit. The appointment-duration guide explains why property size, circuit count, records, access and defects can affect time on site; it is not a validity article. The cost page owns residential pricing and the separation between standard domestic booking and scoped commercial quotations. Reading those pages before arranging access can reduce avoidable uncertainty without promising an exact duration or outcome.
After inspection, begin with the report’s overall assessment and coded observations. The unsatisfactory landlord guide explains the relationship between the outcome, remedial work, further investigation and records. The remedial-work page describes the service pathway for addressing findings. A new booking is not a substitute for making urgent danger safe, and remedial work should respond to the actual observation rather than a generic list attached to a code.
Technical explainers without one-fact verdicts
Technical articles translate common report language into practical questions. High Ze concerns external earth fault loop impedance and requires the measured result, earthing arrangement and supply context to be understood. Missing protective bonding calls for confirmation of the services present and how protection is arranged. RCD, SPD and AFDD articles distinguish absence of a feature from an automatic fail in every existing installation.
The same discipline applies to the 230V shaver-socket scenario and C2 observations: an online title is not enough to classify a real installation. Use these guides to understand terminology, gather the relevant section of your report and have a focused conversation with the inspector or another competent person. Do not use them to erase limitations, downgrade observations remotely or authorise work without a suitable assessment.
Property use changes the route and the advice
A private rented flat, owner-occupied house, short-term let, shop and multi-board commercial site can raise different legal, operational and technical questions. The topic groups keep those contexts visible. Short-term-let guidance explores why the label alone does not settle the applicable regime. Commercial guidance highlights scoping, distribution complexity, access windows and operational risk rather than applying a residential bedroom calculator to business premises.
If a property has changed use, occupancy or electrical configuration since the last report, read the validity guide and audience-specific service page together. Guidance can identify information to gather, but the booking or quotation route must still capture the real property. Mixed-use and unusual premises should be described fully so the proposed scope does not omit shared supplies, communal areas or specialist equipment.
Featured high-value starting points
For a code on an existing report, start with “EICR C1, C2, C3 and FI codes explained”. For a C2 specifically, continue to the dedicated C2 article. For a date or renewal question, open “EICR validity and renewal in London”. For the time needed on site, use “How long does an EICR take in London?”—duration and validity are deliberately separate.
Landlords with an unsatisfactory result should use the unsatisfactory outcome guide; readers assessing protective measures can choose the relevant RCD, AFDD, bonding or shaver-socket article. Commercial readers should begin with the commercial EICR service guide because scope and quotation information shape the inspection. These featured routes are starting points, not a ranking of every article or a substitute for reading the report.
- Classification guide for C1, C2, C3 and FI observations
- Validity and renewal guide for context-dependent timing
- Unsatisfactory EICR guidance for landlord next steps
- Duration guide for access, preparation and time on site
- Commercial guide for business-premises scope and quotations
Find the right service when you are ready
Use these articles to understand an observation, prepare the property or decide what to ask about an existing report. When you are ready to arrange an inspection, the EICR services page helps you choose the route that fits your home, rental property or business.
The landlord, homeowner and commercial guides explain what to arrange and the information we need. For a residential price, use the certificate-cost page or calculator. You can also contact the team with your address and previous report if you are unsure which service to request.
Know when to read and when to book
Read first when you are trying to understand a code, decide which records matter, distinguish validity from appointment duration, or prepare questions about an existing result. Book when the need for a domestic inspection is clear and the property fits the residential route. Request a commercial quotation when premises, distribution or operating constraints require scoping. If there are signs of immediate electrical danger, seek prompt competent assistance rather than treating the hub or a routine booking slot as an emergency service.
Guidance cannot predict that an installation will be satisfactory or quote remedial work before relevant defects are known. Equally, booking does not require you to master every technical article. Provide accurate property details, the previous report where available and information about access or alterations; the inspection process can then address the actual installation.
A practical way to use the hub
First, identify whether your question concerns a finding, a legal or audience context, the inspection process, an outcome, a technical protective measure or property use. Second, read the entry summary and choose the narrowest relevant article. Third, compare the article with the exact wording, measurements and limitations on your report. Finally, follow the appropriate next route: ask the issuing inspector a focused question, obtain legal or contractual advice where needed, arrange remedial assessment, book a residential EICR or request a commercial quotation.
Return to the broader classification guide if a focused article assumes terminology you do not recognise. Use the validity guide when a timing question is being confused with report authenticity or appointment length. This keeps general education in its proper place: useful for understanding and preparation, but subordinate to property evidence, current official requirements and competent site-specific judgement.
Move from guidance to the appropriate next step
If you know that a residential inspection is needed, use the book EICR route. If you manage a business, mixed-use building or complex installation, open the commercial quotation pathway with enough information for scoping. For price structure, use the EICR certificate cost page. Otherwise, choose the topic group matching your question and keep the report available while you read.
EICR findings and classification codes
Reviewed 2026-08-01
EICR C1, C2, C3 and FI codes explained
Durable overview of classification codes, outcomes, and what to do next after the report.
Reviewed 2026-08-01
What does C2 mean on an EICR?
Explains a C2 “potentially dangerous” observation, how it affects an unsatisfactory outcome, and why the recorded defect and context—not the code in isolation—should guide the next conversation.
Reviewed 2026-08-01
Is no RCD a fail on an EICR?
Context-dependent guidance on absent RCD protection and report outcomes.
Reviewed 2026-08-01
No SPD on my EICR report
What missing surge protection may mean and what to ask next.
Reviewed 2026-08-01
Is no AFDD a fail on an EICR?
Separates current AFDD requirements for relevant new work from condition reporting on an existing installation, avoiding the misleading claim that absence alone always produces one EICR outcome.
Reviewed 2026-08-01
High Ze on an EICR
Explains what a high Ze reading may indicate, why earthing arrangement and supply context matter, and which details to check before treating one measurement as a complete diagnosis.
Reviewed 2026-08-01
Missing bonding on an EICR
Covers the protective purpose of main bonding, the checks needed around incoming services and earthing arrangements, and why classification must follow the actual installation rather than a stock verdict.
Reviewed 2026-08-01
230V shaver socket without RCD protection
Works through a 230V bathroom shaver-socket scenario, including product type, location and protective measures, without presenting the title as a universal C2 classification for every installation.
Reviewed 2026-08-01
EICR report example — how to read the sections
A privacy-protected example from an actual inspection record, explaining the outcome, observations, limitations and test schedules.
Reviewed 2026-10-07
What kinds of issues can an EICR identify?
An EICR can record categories of condition on a fixed electrical installation. It does not rank how often they occur, and it does not assign a code before the i
Reviewed 2026-10-07
When a failed EICR does not mean a new consumer unit
An unsatisfactory report does not automatically require a new consumer unit. Plastic enclosures, a missing SPD and an AC-type RCD are not, by themselves, a fail
Reviewed 2026-10-07
Borrowed Neutral on an EICR: Why It Fails and the Fix
EICR failed because a borrowed neutral was detected
Reviewed 2026-10-07
EICR Failed: Damaged Consumer Unit Cover or Missing Blanks
EICR failed for a missing or damaged consumer unit cover
Reviewed 2026-10-07
High R1+R2 on an EICR: Poor CPC Continuity Explained
EICR failed for high R1+R2 or poor CPC continuity
Reviewed 2026-10-07
Incorrect Circuit Labelling on an EICR: C3 or Fail?
Incorrect circuit labelling means the board schedule does not reliably identify the circuits. It is not, by itself, one universal EICR code.
Reviewed 2026-10-07
Missing Gas Bonding on an EICR: C2 Fault and the Fix
Missing gas bonding marked C2 on an EICR
Reviewed 2026-10-07
A reported missing main earthing terminal
A missing main earthing terminal is not the same thing as missing bonding or a consumer-unit fault, and the phrase does not assign one code.
Reviewed 2026-10-07
Mixed MCB or RCD Brands on an EICR: Is It a Fail?
Mixed MCB, RCD or RCBO brands in a consumer unit are not an automatic EICR failure. Compatibility depends on the manufacturer, the enclosure and the condition f
Reviewed 2026-10-07
Overloaded Circuit on an EICR: What It Means and the Fix
An overloaded-circuit note is not one EICR code. The code depends on the load, the device, the cable and any damage.
Reviewed 2026-10-07
Reversed polarity at a socket is not one universal EICR code
Reversed polarity means line and neutral are transposed. The code depends on the condition, the place, and the risk. It is not a DIY repair guide.
Reviewed 2026-10-07
Ring Final Continuity Failed on an EICR: Causes and Fix
A failed ring-final continuity result is not the same as a high R1+R2 reading. The code depends on the condition found.
Reviewed 2026-10-07
Failed EICR: Can I Still Rent My Flat? What the Law Says
Failed EICR: can I still rent my flat in London?
Reviewed 2026-10-07
Failed Your EICR? What to Do Next (London Landlord Guide)
Start with the observation numbers, then separate C1, C2, C3 and FI. The code letter does not by itself decide the remedial period.
Reviewed 2026-10-07
A messy consumer unit is not an automatic EICR code
Appearance, labels, terminations and the enclosure are different observations. A messy board does not by itself assign an EICR code.
Reviewed 2026-10-07
EICR Failed for a Broken Socket? Code, Fix and Cost
My EICR failed for a broken socket
Reviewed 2026-10-07
What an EICR tests, and what it leaves out
An EICR covers the fixed installation within the agreed extent. It does not test every appliance, and this page gives no failure rate or borough ranking.
Reviewed 2026-10-07
Water Leak in Your Flat? When You Need an EICR
A water leak in a flat does not by itself assign an EICR code, and it does not mean every leak needs a full periodic inspection. Deal with immediate danger firs
Reviewed 2026-10-07
Bathroom Lights Failed an EICR? IP Ratings and the Fix
Why your bathroom lights failed an EICR
EICR findings and classification codes
What does C1 mean on an EICR?
C1 means danger present, and the danger needs immediate action. It is not an improvement note, and it is not the same as C2, C3 or FI.
EICR findings and classification codes
What does C3 mean on an EICR?
C3 means improvement recommended. C3 alone does not make the report unsatisfactory, and it is not an instruction to ignore the note.
EICR findings and classification codes
How to read a failed EICR that uses more than one code
C1, C2, C3 and FI on one EICR: read the overall assessment, understand each observation and plan the next steps for your London property.
EICR findings and classification codes
What does FI mean on an EICR?
FI means further investigation is advised. It does not name one cause, and it does not by itself set the repair.
EICR findings and classification codes
Will a visible clue tell you the EICR result before the inspection?
A modern look, an older board, a previous report or a move-in date does not set the result. See what each clue does and does not tell you.
Landlord guidance
Reviewed 2026-08-01
Unsatisfactory EICR for landlords
What an unsatisfactory outcome means and practical next steps.
Reviewed 2026-08-01
Tenant refuses EICR access in London
Practical guidance on documented access attempts — not legal advice.
Reviewed 2026-08-01
EICR certificates for short-term lets in London
Examines how tenure, use, lease or licence terms and local requirements can affect short-term-let electrical safety planning; general 2026 guidance, not a claim that one rule covers every stay.
Reviewed 2026-10-07
Which electrical scope a managed block actually has
Build-to-rent, co-living and managed-block labels do not choose the electrical duty. Separate the dwelling, communal areas, plant, management company, registere
Reviewed 2026-10-07
What to establish before inspecting an empty inherited property
Name the address, who can open an empty inherited property, whether there is power, and who should receive the report. Probate is not treated here as an inspect
Reviewed 2026-10-07
EICR for Communal Areas in Blocks of Flats: Who and How
EICR for communal areas in London blocks of flats
Reviewed 2026-10-07
Which unit and which board is a converted-flat inspection for?
Name the flat, the distribution board and whether a second installation is included. One report does not automatically cover a whole converted building.
Reviewed 2026-10-07
Which EICR question is an estate or letting agent asking?
Decide whether the enquiry is a let, a sale, a general condition report, or a booking. A sale does not automatically require an EICR on this page.
Reviewed 2026-10-07
How a landlord should read the EICR price
The cost page holds the prices. This page explains flats, houses, VAT and the travel fee, and why remedial work is not included.
Reviewed 2026-10-07
How London Councils Enforce EICR Rules (and Fines)
A London council enforces the rented-housing electrical duties through notices and, where the tests are met, a financial penalty. The ceiling is on the penalty
Reviewed 2026-10-07
Is a remedial notice the same as an improvement notice?
A remedial notice under the electrical-safety regulations and a Housing Act 2004 improvement notice are different documents. Read the notice you were given.
Reviewed 2026-10-07
When the tenancy is close and the EICR is unclear
If a tenancy is about to start, check whether a valid report already exists before booking. This page offers no same-day certificate and no exemption from the i
Reviewed 2026-10-07
What a London landlord should be able to show in 2026
A file check for a specified tenancy: the report, its next inspection date, and the draft that is still not law. This is not a failure-rate or borough report. R
Reviewed 2026-10-07
What to do when an insurer asks for electrical papers
Ask which document is wanted and send only the papers you hold. Confirm your insurer’s requirements before arranging new work.
Landlord guidance
Does an older edition of BS 7671 fail an EICR?
An EICR is a condition report, not a certificate that the installation was rebuilt to the newest amendment. Age alone does not decide the code.
Landlord guidance
Can I rent my property without an EICR in London in 2026?
Can you let a London property without an EICR in 2026? Read about private-tenancy duties, exceptions, penalties and arranging an inspection.
Landlord guidance
Do I need a new EICR for a new tenant in London?
The duty is an inspection before the tenancy and then at the interval the report sets. A draft that would widen an existing report is not current law.
Landlord guidance
Which test is the rental flat actually asking for?
An EICR describes the fixed electrical installation. PAT is the common term used for in-service inspection and testing of portable or plug-in electrical.
Landlord guidance
What a block manager needs to separate before an EICR is quoted
Flats, common parts and plant rooms are different scopes. A managing agent is not automatically the statutory duty-holder.
Landlord guidance
Which papers are worth keeping after an EICR?
What London landlords should keep with the EICR: remedial evidence, further-investigation results and supply proof, so a council or agent request is easy.
Landlord guidance
What should I do if the EICR is expired or missing?
Lost PDF, expired EICR or failed observation? Understand the different next steps and check the inspection duty and date on your report.
Landlord guidance
Booking EICRs for a letting-agent portfolio
EICRs for London letting agents: how to book across a portfolio, what to send for each address, and how reports and remedial paperwork come back to you.
Landlord guidance
What decides the electrical scope of a short let?
EICR rules for short lets and serviced apartments in London: which regime applies, what an inspection covers, and how to stay compliant between guests.
Landlord guidance
What is in force, and what is still a draft
The 30 November 2026 instrument is still a draft. Landlords and housing providers use the duties already in force, and they are not the same duty.
Landlord guidance
What an urgent EICR request does not include
An imminent tenancy or a missing report is an urgent query. It is not a same-day certificate, a legal exemption, or emergency fault repair.
Landlord guidance
What the 2025 amendment changed, and what applies now
The private-rented inspection duty is already in force. The 2025 amendment extended the regime. The 30 November 2026 draft is not current law.
Landlord guidance
Which electrical dates should a landlord separate?
Separate existing electrical safety duties, amendments, proposed changes and the next inspection date on your EICR. Check the relevant official sources.
Landlord guidance
Does the Renters' Rights Act change the EICR duty?
Understand how the Renters' Rights Act 2025 relates to existing landlord electrical safety duties, inspection records and required follow-up work.
Landlord guidance
Which social-housing tenancies the 1 November 2026 date applies to
Regulation 3E is a transitional rule for some registered-provider tenancies. It is not a London deadline and it is not the private-rented interval.
Landlord guidance
What to do when move-in is close and the EICR is not ready
An imminent move-in does not create an emergency exemption from the inspection duty. Read the report you have, then what is still missing.
Landlord guidance
Who is responsible for the EICR, the landlord or the tenant?
For a specified tenancy in England the landlord organises the inspection. A tenant may need to allow access. That practical step does not move the duty.
Homeowner guidance
Reviewed 2026-08-01
EICR validity and renewal in London
When another inspection may be needed — without a universal validity period claim.
Reviewed 2026-08-01
Who can carry out an EICR in London?
Competence and scheme context without company accreditation claims.
Reviewed 2026-10-07
Is My 2021 EICR Still Valid in 2026?
A 2021 inspection date is not automatically expired and not automatically current. Read the next inspection date on that report, then the tenancy.
Reviewed 2026-10-07
What BS 7671 Amendment 4 does and does not do to an EICR
On 6 October 2026 the IET says Amendment 4 is published and Amendment 3 remains valid until 15 October 2026. The standard is not legislation, and an older insta
Reviewed 2026-10-07
How bedroom count sits on the residential EICR rate card
Bedroom count chooses a flat or house band on the published residential rate card. It does not price condition, parking, or commercial work.
Reviewed 2026-10-07
When an existing EICR needs another inspection
Read the next inspection date on the report you hold. That date can be sooner than a general interval. A new tenancy is not, by itself, a renewal rule on this p
Reviewed 2026-10-07
EICR Certificates in the City of London | EC1–EC4 Guide
If the property is in EC1, EC2, EC3 or EC4, this overview helps you find the local inspection guide and choose a residential or commercial enquiry.
Reviewed 2026-10-07
EICR Certificates in Tower Hamlets | Area Guide
If the property is in Tower Hamlets, use this area guide to find the local EICR information, or arrange an inspection where that area has no guide of its own.
Reviewed 2026-10-07
EICR for Schools and Academies in London
A school EICR is planned from the boards, the occupied rooms and the shutdown limits. It is not the private-rented five-year rule.
Reviewed 2026-10-07
Can an electrical inspection happen before you bid at auction?
An inspection before auction depends on access. It does not replace a survey, and this page does not say that an auction purchase requires an EICR.
Reviewed 2026-10-07
What to tell us before an EICR on a complex or high-spec property
Name the boards, smart controls, locked areas and concealed access before the visit. Price and age do not set the result.
Reviewed 2026-10-07
Preparing a shop or salon for a commercial EICR
A high-street EICR is a commercial inspection. This page does not apply the private-rented five-year interval or invent a retail interval. It covers boards, fix
Reviewed 2026-10-07
Planning an EICR in a managed South Bank or Waterloo building
How to plan an EICR in a managed or mixed-use building around South Bank and Waterloo SE1: access, scope, and what to send before a quotation.
Reviewed 2026-10-07
Which electrical scope a managed block actually has
Build-to-rent, co-living and managed-block labels do not choose the electrical duty. Separate the dwelling, communal areas, plant, management company, registere
Reviewed 2026-10-07
What a Victorian or period property does not tell an EICR
Property age does not assign an EICR code. A later rewire, the consumer unit, alterations and the inspection findings are separate facts. This page states no Lo
Reviewed 2026-10-07
EICR or fault finding in Farringdon?
If you have an electrical concern in Farringdon, an EICR and targeted fault-finding answer different questions. This page helps you choose the next step.
Reviewed 2026-10-07
History of the EICR: How UK Electrical Safety Evolved
An EICR is a condition report on an existing installation. It is not the wiring standard, and it is not the rented-housing duty. This page separates those layer
Reviewed 2026-10-07
Digital EICRs: What Software Can and Can't Do
How electricians use software for EICR records, photographs and report preparation, and why inspection findings still require professional judgement.
Reviewed 2026-10-07
Which electrical guide answers your question
Find the electrical safety guide for your property: landlords, HMOs, commercial premises, EICR reports and remedial work.
Reviewed 2026-10-07
Whether completed electrical work needs an EICR
An EICR describes the existing installation. It does not automatically certify new work. An installation certificate and a minor-works certificate answer differ
Reviewed 2026-10-07
What information an EICR is there to include
Extent, outcome, observations, results and the next inspection date. This page does not certify a report you upload, and layout differences are not an automatic
Reviewed 2026-10-07
EICR Remedial Costs in London: What Affects the Price?
Unsatisfactory does not set a repair price. The observations, any further investigation, and the work itself do. This page does not list prices or a customer in
Reviewed 2026-10-07
What does EICR stand for?
EICR stands for Electrical Installation Condition Report. It is the report of an inspection and test of a fixed electrical installation.
Homeowner guidance
Do I need an EICR for my own home?
Do owner-occupiers need an EICR? No legal duty in England, but when an inspection makes sense for your own home, sale, remortgage or renovation.
Homeowner guidance
Where does an EICR sit in a mortgage or property sale?
When an EICR is asked for during a London property sale or remortgage, what it tells a buyer or lender, and how to arrange one quickly before exchange.
Homeowner guidance
How does an EICR differ for a flat and a house?
How EICRs for flats and houses differ in access, boards and shared areas. Check current inspection prices for your property type.
Homeowner guidance
Who pays for an EICR in a London leasehold flat?
Who pays for an EICR in a London leasehold flat depends on the inspection, the defect, who controls that part, and the lease.
Homeowner guidance
EICR for home buyers in London
Buying a London home? Check the fixed electrics before exchange. Get a clear EICR, understand the findings and request one quote for agreed repairs.
Homeowner guidance
What an EICR can and cannot say in an insurance claim
How an EICR affects insurance claims in London: what insurers ask for, what the report proves about the installation, and why a missing report is a risk.
Homeowner guidance
How do I check whether an EICR is genuine?
Check the address, the date, the schedules, and whether the contractor can explain the report. A missing scheme logo does not prove the report is fake.
Homeowner guidance
Who arranges an EICR when a property is being bought
A property purchase does not by itself create the private-rented inspection duty. Buyer, seller and solicitor are choices, not a universal legal must.
Commercial guidance
Reviewed 2026-08-01
Commercial EICR certificates in London
Scoped quotations for business premises — not bedroom calculator pricing.
Reviewed 2026-10-07
When a business change is a reason to look at the electrical papers
A new occupier, fit-out or handover can be a reason to review the existing report and the scope. It does not by itself create an EICR deadline.
Reviewed 2026-10-07
What to identify at a commercial handover before the inspection
Plan a commercial lease handover EICR: identify the installation, contacts, existing records and access, then confirm responsibility with your adviser.
Reviewed 2026-10-07
How to plan an inspection in a care or supported-living building
Plan access, isolation and occupied rooms. There is no single care-home interval on this page. Clinical equipment is not the fixed installation.
Reviewed 2026-10-07
An EV charger on an EICR of a rented or commercial property
A charger connected to the fixed installation is inspected as part of that installation. Its presence is not a code, and the report is not a charger certificate
Reviewed 2026-10-07
EICR and listed or heritage buildings
A listing does not assign an EICR code and is not a consent decision. The inspection records condition, limitations and observations. Consent for later work sit
Reviewed 2026-10-07
Planning an EICR for a restaurant, cafe or commercial kitchen
A kitchen EICR is planned from the boards, the fixed loads and the hours the kitchen can be off. It is not the private-rented five-year rule.
Reviewed 2026-10-07
What to send before a warehouse or workshop EICR
Name the boards, plant, loading and working areas, and access limits before a warehouse or workshop inspection. No industrial tariff is published here.
Reviewed 2026-10-07
What to send before a hotel inspection is quoted
Name the boards, the areas that can be opened, and any supply that must stay on. No hotel tariff and no price per room is published here.
Commercial guidance
What to prepare for a commercial EICR in central London
A central London commercial EICR is scoped from the premises, the boards and the access. It is not the private-rented five-year rule.
Commercial guidance
What decides the price of a commercial EICR quotation?
A commercial EICR in London is quoted manually. Boards, circuits, access, occupation and shutdown constraints can change the quotation.
Commercial guidance
How an EICR treats solar panels and battery storage
Solar panels and batteries do not automatically assign an EICR code. Learn how their connection and the agreed inspection scope affect the report.
Commercial guidance
How do you plan an inspection in an occupied office?
Plan boards, floors and equipment that must stay on. There is no 2026 office EICR law and no universal five-year office interval on this page.
Commercial guidance
What does three-phase change in an inspection?
Three-phase is a type of supply, not a defect and not a fixed price. A commercial inspection is quoted from the boards, the isolation and the access.
Pricing and inspection preparation
Reviewed 2026-08-01
How long does an EICR take in London?
Explains how property size, circuit count, access, records and discovered issues affect time on site, while keeping appointment duration clearly separate from report validity or renewal timing.
Reviewed 2026-08-01
EICR certificate cost
Residential pricing path and commercial quotation separation.
Reviewed 2026-10-07
What a low EICR quote in London may leave out
A low EICR quote can omit remedial work, VAT, the property band, travel or parking. Published residential figures sit on the cost guide. This page makes no pric
Reviewed 2026-10-07
What costs can follow an unsatisfactory EICR?
After an unsatisfactory EICR in London the next costs are categories, not one repair figure: investigation, remedial work, access, and verification. Inspection
Reviewed 2026-10-07
Best EICR Companies in London: How to Choose (2026)
Choosing an EICR company in London? Check electrician competence, insurance, inspection scope, VAT and report arrangements before booking.
Pricing and inspection preparation
The cost of ignoring an EICR is not an automatic fine
Understand landlord electrical safety duties, potential penalties up to £40,000 and the steps to take after an unsatisfactory EICR in England.
Pricing and inspection preparation
What to expect when an EICR is carried out
Prepare for your London EICR: arrange access, plan power interruptions and understand the observations, limitations and report you receive.
Pricing and inspection preparation
EICR certificate cost for landlords in London
What changes a London landlord EICR quote: property type, VAT, travel and separate repairs. Check current residential prices on our rate card.
Pricing and inspection preparation
What does an EICR inspection quote cover?
Compare London EICR quotations: inspection scope, testing, report delivery, access limitations and separately agreed repair work.
Pricing and inspection preparation
What the London EICR price depends on
The London EICR inspection price depends on the property, not on a 2025 average. The current residential figures are on the EICR cost page.
Pricing and inspection preparation
EICR and electrical safety certificate: the difference
An EICR is a condition report on an existing installation. An installation certificate and a minor works certificate describe new or altered work.
Pricing and inspection preparation
Do you need an EICR, PAT testing, or both?
An EICR concerns the fixed installation. PAT concerns portable equipment. One does not replace the other, and this page does not set a PAT interval.
Pricing and inspection preparation
What should you send so an HMO inspection can be quoted?
HMO EICR cost in London for 2026: how units and shared supplies are priced, what the inspection covers for licensing, and how to get a fixed quote.
Pricing and inspection preparation
How do I calculate an EICR cost in London?
The residential calculator uses flat or house, the bedroom band and the postcode. It does not price commercial premises or repairs.
Pricing and inspection preparation
What does an EICR cover?
What an EICR assesses, how scope and limitations affect the report, and why appliances, repairs or specialist systems may need separate instructions.
Remedial work and next steps
Reviewed 2026-08-01
Remedial work for failed EICR certificates
How remedial work relates to coded observations after inspection.
Reviewed 2026-10-07
Does an unsatisfactory EICR mean the property needs rewiring?
An unsatisfactory report records observations. It does not order a complete rewire. The scope follows the report, not the age of the building.
Reviewed 2026-10-07
How to arrange an EICR, from the request to the report
Choose the service, send the scope and access details, and book a visit. The appointment windows are not a same-day certificate or a guaranteed pass.
Reviewed 2026-10-07
How to prepare for an EICR without trying to predetermine it
Preparation means access, keys, documents and notice. It does not determine observation codes, and this page does not promise a satisfactory result or describe
Reviewed 2026-10-07
Using the same contractor for EICR remedial work
The same contractor may do remedial work after its own EICR. That is not mandatory, a different contractor is not required, and the same contractor does not by
Reviewed 2026-10-07
Why EICR Remedial Work Is Quoted Separately
The inspection records the condition. The repair is scoped afterwards. A gap between them does not extend a legal deadline.
Remedial work and next steps
Can a different company carry out the remedial work?
Inspection and remedial work are separate instructions. You can choose a competent electrician for repairs independently of the inspecting company.
Remedial work and next steps
Do you need a new EICR after remedial work?
A repeat EICR is not automatic after repairs. Learn which completion documents to keep and when another inspection may be needed.
Remedial work and next steps
What affects EICR remedial work costs in London
What changes the cost of putting EICR defects right: the observations, the access, and whether further investigation is still needed.
Remedial work and next steps
Can I still rent in London after a failed EICR?
An unsatisfactory EICR does not decide the letting by itself. Read the observations, the property, and whether a tenancy has already started.
Remedial work and next steps
Why a new EICR failed after the previous one passed
An earlier satisfactory EICR does not cancel a later observation. Condition, access, later work and the date of each inspection can all differ.
Remedial work and next steps
The first steps after an unsatisfactory EICR
Start with the overall result and the observations. A failed report is not one code, and it does not set a new deadline on this page.
Related pages
Book your EICR in two minutes
Fixed prices from £142.80 including VAT. Pick a weekday window, or ask for an evening or weekend, and receive your EICR after payment. It is usually ready within 24 hours of completing the inspection.
- 5.0Google (58)
- 4.6Trustpilot (19)
- From £142.80 inc VAT
- EICR usually ready within 24h
